成人做爰69片免费看网站丨国产suv精品一区二区883丨偷窥村妇洗澡毛毛多丨国产一区二区精品久久丨中文字幕一区二区人妻电影

上海金泰工程機械有限公司
上海安亭洛浦路45號 400-820-8326

NEWS

BZ70 Hydraulic walking pile frame

2010-03-20

BZ70 Hydraulic walking pile frame is our heavy equipment which is integrated by mechanical, electrical and hydraulic systems. It is specially made for SMW(Soil Mixing Wall) construction. As a 70 tons grade pile frame, this type machine integrated by new hydraulic system is developed from our JB series Hydraulic walking pile frame technology and construction experience through improved quality and performance. This equipment not only can be hung with SMW multi-shafts drilling machines, but also can be used in other foundation construction projects. So this high performance model machine is a multi-functional equipment to work in foundation projects, such as bridges, harbors and diaphragm walls.


 

1.Stable machine system
Mast, main platform and walking framework are specially designed for heavy pile foundation.
39m mast can meet the construction requirements of ZKD100-3 and ZKD85-3. The bore hole depth could be 32m.
It is adopting big capacity reel drum, the main drum can hold the rope capacity of 550m, and the Max. pulling force is 91.5KN. The auxiliary drum rope capacity is 265m.
The main and auxiliary winches adopt hydraulic proportional control system to achieve continuously variable transmission and lock random speed.
The pace of transverse walking track cylinder is 3100mm, which is well-considered of the SMW construction requirements.
Lifting-up cylinder stroke is 900mm, having the good trafficability.
The stroke of mast horizontal inching cylinder is 400mm and improved the flexibility of construction.
All cylinders adopt hydraulic proportional control system to make them balanced.
2.Comfortable cabin
All-transparent cab, bright, quiet and operator can avoid tiredness.
Easy hydraulic operation, the operation handle of cylinder is ahead of operator.
3.Easy operating system
The operation case is preserved in the cab as well as inductance loading angle monitor (optional) and deep mixing pile monitor (optional).
4.Advanced imported components
The main pump, control valve, pressure meter and winch adopt international brands, such as American, Italy and Germany etc.

5.convenient installation and transportation
The whole machine adopts building-block type and meets the requirements of transportation width and height, easy dismantlement and installment.
The extent girder is driven by hydraulic cylinder and adopts pin swing mechanism to avoid the dismantlement trouble.
39m mast can be self-driven without cranes.

6.sensitive safety operation management device
The inductance loading angle monitor is optional in base of goniometer. This monitor can offer the report to operator about the mast inclination and tensile load situation. It also can give an alarm when in danger.
Deep mixing pile monitor (optional) can feedback pile depth, drilling speed, total slurry  
and slurry for each passage. All these information can be printed according to pile numbers.

主站蜘蛛池模板: 偷看农村妇女牲交| 欧美老熟妇欲乱高清视频| 亚洲色精品vr一区区三区| 日韩欧美亚洲综合久久影院| 国产亚洲精品久久久网站好莱| 色丁香婷婷综合久久| 久久久精品国产sm调教网站| 国产欧美日韩在线观看一区二区| 九九久久精品国产av片国产| 午夜乱人伦精品视频在线| 国产乱人伦真实精品视频| 无码r级限制片在线观看| 精品亚洲国产成人av| 四虎影视884a精品国产| 极品少妇xxxx| 97人人添人澡人人爽超碰| 国产二级一片内射视频插放| 乱中年女人伦av一区二区| 老熟女乱之仑视频| 成人av无码一区二区三区| 亚洲欧美18岁网站| 亚洲国产精品成人无码区| 自拍偷在线精品自拍偷无码专区| 日韩av高清在线观看| 午夜福利无码不卡在线观看| 波多野结衣高潮av在线播放| 亚洲欧美高清一区二区三区| 国产精品无码av一区二区三区| 欧美成人a激情| 最新国产乱人伦偷精品免费网站| 亚洲欧洲日韩av在线观看| 久久国产免费观看精品3| 97精品国产97久久久久久免费| 国产精品国产av片国产| 综合图区亚洲另类图片| 欧美日韩一区二区三区自拍| 99尹人香蕉国产免费天天| 乱妇乱女熟妇熟女网站| 国产人在线成免费视频| 久久久精品国产sm调教网站| 日本爽爽爽爽爽爽在线观看免 |