NEWS

BZ70 Hydraulic walking pile frame

2010-03-20

BZ70 Hydraulic walking pile frame is our heavy equipment which is integrated by mechanical, electrical and hydraulic systems. It is specially made for SMW(Soil Mixing Wall) construction. As a 70 tons grade pile frame, this type machine integrated by new hydraulic system is developed from our JB series Hydraulic walking pile frame technology and construction experience through improved quality and performance. This equipment not only can be hung with SMW multi-shafts drilling machines, but also can be used in other foundation construction projects. So this high performance model machine is a multi-functional equipment to work in foundation projects, such as bridges, harbors and diaphragm walls.


 

1.Stable machine system
Mast, main platform and walking framework are specially designed for heavy pile foundation.
39m mast can meet the construction requirements of ZKD100-3 and ZKD85-3. The bore hole depth could be 32m.
It is adopting big capacity reel drum, the main drum can hold the rope capacity of 550m, and the Max. pulling force is 91.5KN. The auxiliary drum rope capacity is 265m.
The main and auxiliary winches adopt hydraulic proportional control system to achieve continuously variable transmission and lock random speed.
The pace of transverse walking track cylinder is 3100mm, which is well-considered of the SMW construction requirements.
Lifting-up cylinder stroke is 900mm, having the good trafficability.
The stroke of mast horizontal inching cylinder is 400mm and improved the flexibility of construction.
All cylinders adopt hydraulic proportional control system to make them balanced.
2.Comfortable cabin
All-transparent cab, bright, quiet and operator can avoid tiredness.
Easy hydraulic operation, the operation handle of cylinder is ahead of operator.
3.Easy operating system
The operation case is preserved in the cab as well as inductance loading angle monitor (optional) and deep mixing pile monitor (optional).
4.Advanced imported components
The main pump, control valve, pressure meter and winch adopt international brands, such as American, Italy and Germany etc.

5.convenient installation and transportation
The whole machine adopts building-block type and meets the requirements of transportation width and height, easy dismantlement and installment.
The extent girder is driven by hydraulic cylinder and adopts pin swing mechanism to avoid the dismantlement trouble.
39m mast can be self-driven without cranes.

6.sensitive safety operation management device
The inductance loading angle monitor is optional in base of goniometer. This monitor can offer the report to operator about the mast inclination and tensile load situation. It also can give an alarm when in danger.
Deep mixing pile monitor (optional) can feedback pile depth, drilling speed, total slurry  
and slurry for each passage. All these information can be printed according to pile numbers.

主站蜘蛛池模板: 中国老妇xxxx性开放| 色综合视频一区二区三区44 | 久久夜色精品国产爽爽| 国产精品麻豆成人av在线观看| 两个人看的www在线观看| 艳妇臀荡乳欲伦69调教视频| 中文字幕无码av不卡一区| 精品无人区无码乱码毛片国产 | 日本在线高清不卡免费播放| 亚洲 日韩 国产 中文有码| 亚洲精品国产精华液| 最新在线精品国产福利| 人妻 校园 激情 另类| 精品无码国产av一区二区三区| 国产亚洲精aa在线观看see| 亚洲熟妇久久精品| 日韩高清在线亚洲专区小说| 国内精品久久毛片一区二区| 337p日本欧洲亚洲大胆在线| 欧美精品一区二区精品久久| 欧美日本日韩aⅴ在线视频| 日韩无套无码精品| 精品香蕉久久久午夜福利| 99久久久精品免费观看国产| 色欲天天天综合网| 综合图区亚洲另类图片| 激情综合丁香五月| 亚洲精品国产精品国产自 | 2021精品高清卡1卡2卡3老狼| 中文无码一区二区不卡αv| 一本色道久久东京热| 麻豆一区二区三区精品视频 | 欧美日韩中文国产一区| 色狠狠av老熟女| 亚洲精品揄拍自拍首页一| 女人夜夜春精品a片| 美女被抽插到哭内射视频免费| 亚洲丶国产丶欧美一区二区三区| 国模无码大尺度一区二区三区| 国模吧双双大尺度炮交gogo| 久久精品女人天堂av|