88av网站-亚洲欧美日韩综合俺去了-国产h在线-大陆国语对白国产av片-99国产精品入口-久久福利精品-亚洲免费观看av-中国三级视频-91啦中文-久久免费视频2-亚洲精品亚洲人成在线观看麻豆-久久综合伊人-k8经典少妇在线观看-精品成人免费视频-亚洲69av-久久亚洲国产五月综合网-国产百合互慰吃奶互揉视频-成人做爰www网站视频下载-中文在线字幕av-少妇一级1淫片

上海金泰工程機械有限公司
45 Luopu Road, Anting, Shanghai 400-820-8326

NEWS

No.07 SD20 Rotary Drill construct in XiLong Jobsite

2009-07-07

Recently, in XiLong hydro junction jobsite, Hubei province, one unit SD20 which had worked for 6000 hours has set the new record in foundation piles.

 

XiLong hydro junction started in Feb, 2009 is the major national project, which is located in HuBei province. One of important projects is to establish a bridge on old riverbed. It is difficult with high pile requirements. The pile should be 1.5m Dia and 55m Dep. The situation of the old riverbed is complicated, and alternative allocated with clay, fine sand, and locked clay from 0-30m, below 30m, there is big and hard cobble layer.


When SD20 applied to the project, it finish a 55m depth and 1.5 dia pile with 8 hours, high efficiency and precision is praised by the projects owner. This SD20 had worked more than 6000 hours since may, 2006. The excellent performance has greatly proved the quality of our machines.

Now, this project is under way, SD20 and SG40A, SG40E worked there day and night to contribute to the national infrastructure projects.